January 09, 2020
The front part of the electronic fence is an important part of the electronic fence system. In order to ensure the normal operation and long service life of the entire electronic fence system, the front end of the electronic fence must have basic functions such as anti-high pressure, anti-fouling, anti-oxidation and anti-corrosion. The front of the fence is made up of dozens of accessories. Each type of accessories is professionally developed for the production of electronic fences and open molds. The accessories used in this design have won a number of design patents.

The front end of the electronic fence is mainly composed of the following parts: terminal rods, fixing clips, terminal rod insulators, bearing rods, bearing rod insulators, PV crossover rods, PV over-wire rod insulators, universal bases, alloy wires, lightning arresters, and Tighteners, cord connectors, warning signs, end caps, etc.

The construction and installation regulations mainly include (1) Construction principles:

Accurate, strict, high quality, and high efficiency.

(b) Construction procedures:

(III) Construction Specifications:

1. The base must be installed with a firm and horizontal structure. Keep a straight line between the front and rear bases as far as possible. Keep vertical as far as possible with the iron fence.

2. The base is fixed and fixed. Stainless steel expansion bolts or ordinary expansion bolts are used. Stainless steel bolts are preferred for rust prevention and long-term use. The base of the terminal rod is 8mm bolts, and the middle rod base is 6mm bolts.

3. The fence wires should be parallel and equidistant and should be 200mm ± 20mm.

4. The fence tensioner maintains a vertical line between the top and bottom.

5. The distance between the top fence and the top of the wall is not less than 750mm, and the distance between the bottom fence and the top of the fence is 150mm±20mm.

6. The detection distance of the active infrared detector is not more than 70% of the distance specified by the manufacturer, and the distance between the next optical axis and the top of the wall is 150mm±10mm.

7. The high-voltage insulated wire in the middle of the wire connector needs to wear a smooth PVC thin tube to prevent aging.

8. When arranging the PVC pipe, it is necessary to ensure that there is a joint between the pipe, and use V-PVC special glue to bond firmly. Should communicate with Party A to confirm the use of edge edge pipe or underground pipe. When underground pipes need to be excavated, a certain depth (about 40cm) should be ensured.

9. When laying cables, it is necessary to ensure that one line goes to the end, and the joints are strictly avoided in the middle; in particular, underground pipes should be resolutely eliminated. When purchasing the cable, if the length is not enough, the cable should be customized earlier.

10. When installing lightning arresters, the ground piles must be driven below 80cm below the ground. Each arrester should be connected to two ground piles, and the distance between the ground piles should be more than 2m. Ground pile reference specifications: length 1.0m, diameter 1-2cm.

11. A warning sign should be hung between the piers (10m) to fully alert the police.
Hubungi Kami

Pengarang:

Mr. Alex Wang

Phone/WhatsApp:

+8615132411183

Produk popular
Anda juga suka
Kategori yang berkaitan

E-mel kepada pembekal ini

Subjek:
E-mel:
Mesej:

Mesej anda MSS

Hubungi Kami

Pengarang:

Mr. Alex Wang

Phone/WhatsApp:

+8615132411183

Produk popular
Berkomunikasi dengan pembekal?Pembekal
Alex Wang Mr. Alex Wang
Apa yang boleh saya lakukan untuk anda?
Hubungi pembekal